The façade works are now closed subject to minor works. The floor-to-ceiling and curtain-wall façade in all the lower floors of Tower Q4 is now complete.

Fixing of stainless-steel railing in the maintenance balconies are ongoing in Towers Q3 & Q4. The sides and underside of these balconies are also being covered with aluminium composite white cladding material.

The works on the steel bridges connecting the towers are ongoing. The aluminium composite cladding material works, the raised flooring and the railing of metal mass are nearing completion.

The installation of the mechanical and electrical services is ongoing at all Basement Levels including the core and roof top of Tower Q2.

Levels 01, 02, 05, 06, 07, 08, 09 and 10 of Tower Q3 are in operation.

Works in Levels 03, 04, 15 and 16 of Tower Q3 are ongoing.

Works in Level 01 & 07 of Tower Q2 have started.

Car parking at Level -1 and -2 are in operation.

Piazza works are completed in Levels 00 and 01 subject to minor works to be finalize.

Landscaping works are now complete on Level 01 behind Tower Q4.